Our timeline details the key milestones in its history, from its inception centuries ago, to how it today stands as an iconic structure in the Pontcysyllte Aqueduct & Canal World Heritage Site.
The story of Chirk Aqueduct through the ages
Discover more about the incredible history of the Chirk Aqueduct and how this innovative structure came to be across the Ceiriog Valley and the River Ceiriog.
1793
An Act is passed for the Ellesmere Canal, an ambitious scheme to link the Rivers Mersey, Dee and Severn.
1793
Principal Engineer William Jessop appoints Thomas Telford to supervise the works.
1794
The design for a large embankment near Chirk Castle vetoed by owner Sir Richard Myddleton - the canal is re-routed further away with a 10-arch aqueduct and tunnel.
1795
Jessop and Telford design a masonry aqueduct at Chirk with iron base plates instead of a layer of puddled clay, to reduce the weight on the piers.
The first section of the Ellesmere Canal opens between Ellesmere Port and Chester but the line on to Ruabon is abandoned due to the terrain and lack of water supply.
The route from the south is re-designed to end at Trevor with a tramway to Ruabon.
1796
17 June - the foundation stone is laid for an aqueduct over the River Ceiriog, 700ft in length and 70ft high, which crosses the border between England and Wales.
1799
Ironmaster William Hazeldine supplies the iron base plates from his foundry at Plas Kynaston near Trevor.
1801
In November Chirk Aqueduct, the highest in Britain, is finished for a cost of £20,898.
1802
By Christmas navigation is also open through Chirk tunnel as far as Froncysyllte.
1805
Telford’s huge Pontcysyllte Aqueduct opens, completing the route to Trevor Basin.
1808
The feeder canal from Trevor to Llangollen opens ensuring a constant water supply.
1846
The Ellesmere becomes part of the Shropshire Union Railways & Canal Company.
1848
Chirk railway viaduct built alongside the aqueduct – it is 28ft taller.
1870
Iron side plates added to the trough to alleviate leakage through the masonry walls.
1944
The canal closes for navigation, to be maintained only as a water supply feeder.
1948
Railways and canals are nationalised but the Ellesmere Canal continues to decay.
1949
Author TL Rolt succeeds at his third attempt to cross Chirk and reach Trevor Basin.
1963
Ownership passes to British Waterways.
1966
The Welsh half of Chirk Aqueduct is listed Grade II*.
1980s
The Ellesmere Canal now very popular for leisure boating is renamed the Llangollen.
1987
Belatedly the English half of the aqueduct is also listed Grade II*.
2008
Chirk Aqueduct is jointly designated a scheduled monument in Wales and England.
2009
Chirk Aqueduct included as part of the inscription of Pontcysyllte Aqueduct & Canal World Heritage Site.
2012
Ownership of the Llangollen Canal is transferred to the Canal & River Trust.


Find out more about the 225 anniversary
Last Edited: 27 July 2026

Stay connected
Sign up to our newsletter and discover how we protect canals and help nature thrive