Description
Original 20 November 2026, 2:11pm
We will shortly be carrying out essential repairs at Kinver Lock to address defects affecting the operation of the lock.
During inspections, we identified issues with the top end offside ground paddle mechanism, along with defects to the lock's plank grooves. The inspection found that the plank grooves are in poor condition and can no longer be used safely. As a result, a PortaDam will be installed to allow the lock to be dewatered and the repairs to be carried out, with new plank grooves being fitted as part of the works. To safely undertake these repairs, the lock will need to be temporarily closed to navigation.
These repairs will help maintain the safe and reliable operation of the lock and reduce the risk of unplanned restrictions in the future.
We encourage customers to plan their journeys accordingly. Navigation will be restored as soon as the works have been completed and it is safe to reopen the lock.
We would like to thank you for your patience and understanding while these works are carried out.
