Description
Original 10 September 2026, 10:46am
Third-party contractors will be carrying out inspection works to Bridge 82a, Old Dove House Lane Bridge on the Grand Union Canal using a floating pontoon.
The pontoon is to be positioned to allow waterway traffic to pass during the works. Signage will be placed both upstream and downstream of the works and pontoon access locations to notify boaters and towpath users
