Description
Original 10 September 2026, 10:37am
Third-party contractors are to be carrying out Inspection works to Bridge 83, Castle Lane Bridge on the Grand Union Canal using a floating pontoon.
The pontoon is to be positioned to allow waterway traffic to pass during the works. Signage is to be placed both upstream and downstream of the works and pontoon access locations to notify boaters and tow-path users.
