Description
Original 4 August 2026, 11:06am
A navigation and towpath closure is required to carry out replacement of the top and bottom gates
The charity making life better by water
Making life better by water
Type: Navigation and Towpath Closure
Waterway(s): Regent's Canal
From: 4 January 2027, 8am
To: 12 February 2027, 4pm inclusive
Region: London and South East
Reason: Repair
Programme: Winter works
| Closest waterway | Regent's Canal |
| Starts at | Lock 1A, Hampstead Road Lock |
| Ends at | Lock 2, Hawley Lock |
| Upstream winding hole | Hampstead Road |
| Downstream winding hole | Battlebridge Basin |
A navigation and towpath closure is required to carry out replacement of the top and bottom gates
Sign up to our newsletter and discover how we protect canals and help nature thrive
