Description
Original 28 July 2026, 9:29am
Third-Party Works – Thames Water Flow Gauging and Cross-Sectional River Surveys
The proposed surveys are non-intrusive and are not expected to have any impact on towpath users or navigation.
Cross-sectional river surveys will be carried out from a small work craft.
Where necessary, the vessel will move aside to ensure the safe and unobstructed passage of other boats using the waterway.
We appreciate your co-operation whilst these works are being carried out.
