Description
Original 7 July 2026, 12:04pm
Please be advised that third-party contractors will be carrying out inspection works to Digbeth Railway Bridge 95C on the Grand Union canal, using a pontoon.
The pontoon is to be positioned to allow waterway traffic to pass. Signage is to be placed both upstream and downstream of the works to notify boaters.
