Description
Original 4 July 2026, 9:56am
There is an electrical fault with Aubreys Lift Bridge, Bridge 221. The bridge is not operational and is closed in the down position. A Contractor is currently being mobilised today to address the electrical fault on the bridge. An update will be provided as soon as the bridge has been repaired and is operational again.
