Description
Original 26 June 2026, 9:11am
A navigation closure is required to enable refurbishment works to the head gate at Lock 16, along with the reconstruction of the ground paddle chamber.
The charity making life better by water
Making life better by water
Type: Navigation Closure
Waterway(s): Huddersfield Narrow Canal
From: 11 January 2027, 8am
To: 12 February 2027, 4pm inclusive
Region: North West
Reason: Repair
Programme: Winter works
| Closest waterway | Huddersfield Narrow Canal |
| Starts at | Lock 18 West |
| Ends at | Lock 15 West, Roaches Lock |
| Upstream winding hole | Bridge 82 Manns bridge |
| Downstream winding hole | Bridge 92 Egmont Street bridge |
A navigation closure is required to enable refurbishment works to the head gate at Lock 16, along with the reconstruction of the ground paddle chamber.
Sign up to our newsletter and discover how we protect canals and help nature thrive
