Description
Original 25 June 2026, 10:02am
A navigation closure is required to carry out structural repairs to both of the tail gates of Lock 68 with the aim to improve structural stability.
The charity making life better by water
Making life better by water
Type: Navigation Closure
Waterway(s): Trent & Mersey Canal
From: 27 January 2027, 8am
To: 12 February 2027, 4pm inclusive
Region: North West
Reason: Repair
Programme: Winter works
| Closest waterway | Trent & Mersey Canal |
| Starts at | Lock 69 |
| Ends at | Lock 67 Booth Lane Top Lock |
| Upstream winding hole | Bridge 164 |
| Downstream winding hole | Bridge 162, Dragons Lane |
A navigation closure is required to carry out structural repairs to both of the tail gates of Lock 68 with the aim to improve structural stability.
Sign up to our newsletter and discover how we protect canals and help nature thrive
