Description
Original 23 June 2026, 11am
A navigation and towpath closure are required to facilitate the removal of masts and cables on High Orchard Bridge. The bridge will remain in the closed position while the works are carried out; however, due to safety requirements, vessels of any size will be unable to pass beneath the bridge for the duration of the works.
