Description
Original 16 June 2026, 2:02pm
A navigational closure is required to facilitate replacement of the top lock gate on Lock 13 of the Audlem lock flight. We will also be relining the mitre on the bottom gates and doing various brick repairs.
We will be closing from locks 7 to 13 for water control reasons.
