Description
Original 29 April 2026, 9:42am
A navigation and towpath closure is required for replacement of the bottom and top gates
The charity making life better by water
Making life better by water
Type: Navigation and Towpath Closure
Waterway(s): Oxford Canal
From: 2 November 2026, 8am
To: 18 December 2026, 4pm inclusive
Region: London and South East
Reason: Repair
Programme: Winter works
| Closest waterway | Oxford Canal |
| Starts at | Lock 27, Little Bourton |
| Ends at | Lock 27, Little Bourton |
| Upstream winding hole | Below Wharf Road Bridge 153, Cropedy |
| Downstream winding hole | Between Samuelson Br 168 and what used to be Bridge 169, Calthorpe |
A navigation and towpath closure is required for replacement of the bottom and top gates
Sign up to our newsletter and discover how we protect canals and help nature thrive
