Description
Original 29 April 2026, 9:21am
A navigation closure is required to allow repairs to the bottom lock gates. We will also be doing ladder improvements too. The full flight will be closed so water levels can be controlled and the works carried out safely. Works will also be taking place at Locks 3, 4 and 10 on the Marple Flight at the same time.
