Skip to main content

The charity making life better by water

Lock 19, Hirst Lock, Saltaire

Type: Navigation Closure

Waterway(s): Leeds & Liverpool Canal

From: 2 November 2026, 8am

To: 18 December 2026, 4pm inclusive

Region: Yorkshire and North East

Reason: Repair

Programme: Winter works

Location

Closest waterwayLeeds & Liverpool Canal
Starts atBridge 207, Hirst Mill Swing Bridge
Ends atCulvert 247, Saltaire
Upstream winding holeAbove Lock 19, Hirst Lock
Downstream winding holeBelow Bridge 207B, Victoria Street Bridge, Shipley

Description

Original 28 April 2026, 2:28pm

A navigation closure is required to carry out repair works to the top and bottom gates, by-wash and lock chamber

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive