Description
Original 28 April 2026, 2:22pm
A navigation and towpath closure is required to carry out replacement of the top gate
The charity making life better by water
Making life better by water
Type: Navigation and Towpath Closure
Waterway(s): Glasson Branch (Lancaster Canal)
From: 2 November 2026, 8am
To: 18 December 2026, 4pm inclusive
Region: North West
Reason: Repair
Programme: Winter works
| Closest waterway | Glasson Branch (Lancaster Canal) |
| Starts at | Lock No.4 |
| Ends at | Culvert 2 |
| Upstream winding hole | Galgate Marina |
| Downstream winding hole | Lock 1 Bridge |
A navigation and towpath closure is required to carry out replacement of the top gate
Sign up to our newsletter and discover how we protect canals and help nature thrive
