Description
Original 28 April 2026, 2:18pm
A navigation closure is required to carry out replacement of the top and bottom gates and repair works to the lock chamber
The charity making life better by water
Making life better by water
Type: Navigation Closure
Waterway(s): Huddersfield Narrow Canal
From: 4 January 2027, 8am
To: 12 February 2027, 4pm inclusive
Region: North West
Reason: Repair
Programme: Winter works
| Closest waterway | Huddersfield Narrow Canal |
| Starts at | Lock 7 West |
| Ends at | Lock 4 West |
| Upstream winding hole | Above lock 7 west, Stalybridge |
| Downstream winding hole | Caroline Street Bridge |
A navigation closure is required to carry out replacement of the top and bottom gates and repair works to the lock chamber
Sign up to our newsletter and discover how we protect canals and help nature thrive
