Description
Original 28 April 2026, 2:12pm
A navigation closure is required to carry out replacement of the top and bottom gates
The charity making life better by water
Making life better by water
Type: Navigation Closure
Waterway(s): Huddersfield Narrow Canal
From: 4 January 2027, 8am
To: 12 March 2027, 4pm inclusive
Region: Yorkshire and North East
Reason: Repair
Programme: Winter works
| Closest waterway | Huddersfield Narrow Canal |
| Starts at | Lock 22 East |
| Ends at | Old Bank Bridge |
| Upstream winding hole | Above Lock 31E |
| Downstream winding hole | Above Lock 16E |
A navigation closure is required to carry out replacement of the top and bottom gates
Sign up to our newsletter and discover how we protect canals and help nature thrive
