Description
Original 28 April 2026, 1:31pm
A navigation closure is required to allow the replacement of sections of the lock gates on both sets of gates. Repairs will also be carried out to the lock chamber walls. Please note that works will also be taking place at Lock 80, Coal Pit Lower, at the same time.
