Description
Original 28 April 2026, 12:26pm
A navigation closure is required to allow essential repairs to the lock gates at both the top and bottom of the lock. To carry out the work safely and effectively, the entire flight will be closed so that water levels can be controlled and the works are not flooded while repairs are underway.
