Description
Original 27 April 2026, 2:18pm
A navigation and towpath closure is required to carry out replacement of the top and bottom gates and repair works to the lock chamber
The charity making life better by water
Making life better by water
Type: Navigation and Towpath Closure
Waterway(s): Chesterfield Canal
From: 11 January 2027, 8am
To: 12 March 2027, 4pm inclusive
Region: Yorkshire and North East
Reason: Repair
Programme: Winter works
| Closest waterway | Chesterfield Canal |
| Starts at | Lock 50, Worksop Town Lock |
| Ends at | Lock 50, Worksop Town Lock |
| Upstream winding hole | Sandhill Lake |
| Downstream winding hole | Bracebridge |
A navigation and towpath closure is required to carry out replacement of the top and bottom gates and repair works to the lock chamber
Sign up to our newsletter and discover how we protect canals and help nature thrive
