Description
Original 27 April 2026, 1:26pm
A navigation closure is required to carry out repairs to the bottom gate
The charity making life better by water
Making life better by water
Type: Navigation Closure
Waterway(s): Liverpool Link
From: 1 February 2027, 8am
To: 12 March 2027, 4pm inclusive
Region: North West
Reason: Repair
Programme: Winter works
| Closest waterway | Liverpool Link |
| Starts at | Mann Island Lock |
| Ends at | Mann Island Lock |
| Upstream winding hole | Albert Dock |
| Downstream winding hole | Albert Dock |
A navigation closure is required to carry out repairs to the bottom gate
Sign up to our newsletter and discover how we protect canals and help nature thrive
