Descriptions
Update 28 May 2026, 10:45am
Our teams have been onsite at various locations along the Rochdale Canal carrying out dredging works. Unfortunately, these works have taken longer than expected and are now expected to be completed by 9 June.
Please be aware that dredging equipment will continue to operate at these locations, and vessels will be moving along the canal between dredging sites and areas where dredged material is being offloaded.
The canal is therefore expected to be busier than normal during this time.
Please take care when navigating and follow any instructions given by the contractors, as you may be asked to wait while they move into a safe position to allow you to pass.
Original 16 April 2026, 3:05pm
Our teams will be onsite from 8am on the Monday 20 April until 6pm on the Friday 29 May at various locations on the Rochdale Canal to complete spot dredging.
Please be aware that dredging equipment will be in operation at these various locations, and they will be moving vessels along the canal between dredging locations and locations for the material to be off loaded.
The canal will be busier then normal.
Please take care and listen to the contractor as they may need you to wait while they get in a safe position for you to pass.
