Description
Original 9 April 2026, 8:30am
Repair work is being undertaken at New Lock Footbridge 20 on the Nottingham and Beeston Canal from 27th April for three days.
The bridge will be closed to pedestrians and cyclists during this time, however, the navigation will remain open with some possible delays.
An alternative route will be signposted and can be found via Turnover Bridge 19 which is located approximately 600 metres north east along Canal Side.
