Description
Original 27 March 2026, 1:55pm
Third-party contractors are to be carrying out works to Coleshill Road bridge on the Coventry Canal from the towpath and by using a floating pontoon.
The pontoon is to be positioned to allow waterway traffic to pass during the works.
Signage is to be placed both upstream and downstream of the works to notify boaters and towpath users.
