Description
Original 17 February 2026, 1:35pm
Third-party contractors will be carrying out inspection works on Solihull Lodge Bridge on the North Stratford Canal using a floating pontoon. The pontoon will be positioned to allow waterway traffic to continue passing safely during the works.
Signage will be installed both upstream and downstream of the works area, as well as at pontoon access points, to inform boaters and towpath users of the ongoing activity.
