Description
Original 3 February 2026, 1:51pm
Please be advised that third-party contractors will be carrying out maintenance works at Railway Bridge 131A using a floating pontoon.
The pontoon will be positioned to allow safe passage of waterway traffic during the works.
Signage will be displayed both upstream and downstream of the bridge to notify boaters of the ongoing works.
