Description
Original 3 February 2026, 1:44pm
Please be advised that inspection works will be carried out at Selly Oak Rail Bridge 81 on the Worcester & Birmingham Canal.
A pontoon will be positioned at the bridge to facilitate the inspection. The pontoon will be placed to ensure that waterway traffic can continue to pass safely.
Signage will be displayed both upstream and downstream of the works to notify boaters in advance.
