Description
Original 23 January 2026, 9:47am

Works at Bridge 108B
Third-party contractors will be carrying out inspection works to Railway Bridge 108B on the Birmingham & Warwick Junction canal, using a pontoon.
The pontoon will be positioned to allow waterway traffic to pass.
Signage is to be placed both upstream and downstream of the works to notify boaters.
