Description
Original 9 January 2026, 3:40pm
A stoppage is required to carry out a principal inspection of the bridge. This will take place from 2–6 March, following an earlier stoppage scheduled for 16–20 February.
The charity making life better by water
Making life better by water
Type: Navigation and Towpath Closure
Waterway(s): South Dock
From: 2 March 2026, 8am
To: 6 March 2026, 4pm inclusive
Region: London and South East
Reason: Repair
Programme: Winter works
| Closest waterway | South Dock |
| Starts at | Bridge 1, Manchester Road Bridge |
| Ends at | West India Dock Entrance Lock |
| Upstream winding hole | South Dock |
| Downstream winding hole | River Thames |
A stoppage is required to carry out a principal inspection of the bridge. This will take place from 2–6 March, following an earlier stoppage scheduled for 16–20 February.
Sign up to our newsletter and discover how we protect canals and help nature thrive
