Skip to main content

The charity making life better by water

Shipton Lift Bridge 219

Type: Navigation Closure

Waterway(s): Oxford Canal

From: 15 December 2025, 10:20am

To: 29 December 2025, 11:10am inclusive

Region: London and South East

Reason: Suspected Vandalism

Subject to review on: 30 December 2025

Location

Closest waterwayOxford Canal
Starts atLock 41, Shipton Lock
Ends atFlood Gate
Upstream winding holeSouth of Railway Bridge 215A
Downstream winding holeNorth of Aubrey's Lift Bridge 221

Descriptions

Update 24 December 2025, 10:46am

Repair works are planned to mobilise on 29th December 2025

Original 15 December 2025, 10:40am

Navigation closed

Bridge has been knocked off its mountings and is non operable. The bridge is down and in the closed to navigation position A team has been mobilised to site to assess the extent of the damage and start work designing a repair solution

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive