Description
Original 25 November 2025, 4:13pm
Third-party contractors will be conducting inspection works on Church Bridge along the Wyrley & Essington Canal using a floating pontoon.
The pontoon will be positioned to allow waterway traffic to pass safely throughout the works.
Signage will be installed both upstream and downstream of the work area, as well as at pontoon access points, to inform boaters and towpath users.
