Description
Original 16 October 2025, 8:55am
Top stop plank installation is required to dewater the lock head to identify and if possible, remove obstructions blocking ground paddle culverts at lock 77 Iron Bridge.
We will also take the opportunity to refurbish all paddle connections and fixings below water level.
No assisted passages will be available.