Skip to main content

The charity making life better by water

Navigation Closure Between Bridge 27 Chalk Bridge and Bridge 28 Bleak Hall Bridge (A406), Edmonton

Type: Navigation Closure

Waterway(s): Lee Navigation

From: 1 September 2025, 8am

To: 6 January 2026, 5pm inclusive

Region: London and South East

Reason: 3rd Party Works

Location

Closest waterwayLee Navigation
Starts atBridge 27, Chalk Bridge
Ends atBridge 28, Bleak Hall Bridge (A406)

Description

Original 22 July 2025, 2:47pm

Vinci Construction UK Ltd working on behalf of Meridian Water are constructing a new bridge across the navigation.

To carry out the works they will need night time canal stoppages (11pm to 6am) 1/9/25 to 5/9/25 and 8/9/25 to 25/9/25 and 14/11/25 to 6/1/26 and a 24 hour towpath closure 1/9/25 to 25/9/25 and 14/11/25 to 6/1/26.

The navigation and towpath will be closed between the dates as advised in the description.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive