Skip to main content

The charity making life better by water

Navigation Closure Between Bridge 27 Chalk Bridge and Bridge 28 Bleak Hall Bridge (A406), Edmonton

Type: Navigation Closure

Waterway(s): Lee Navigation

From: 1 September 2025, 8am

To: 16 September 2025, 2:14pm inclusive

Region: London and South East

Reason: 3rd Party Works

Location

Closest waterwayLee Navigation
Starts atBridge 27, Chalk Bridge
Ends atBridge 28, Bleak Hall Bridge (A406)

Description

Original 22 July 2025, 2:47pm

Vinci Construction UK Ltd working on behalf of Meridian Water are constructing a new bridge across the navigation.

To carry out the works they will need night time canal stoppages (11pm to 6am) 1/9/25 to 5/9/25 and 8/9/25 to 25/9/25 and 14/11/25 to 6/1/26 and a 24 hour towpath closure 1/9/25 to 25/9/25 and 14/11/25 to 6/1/26.

The navigation and towpath will be closed between the dates as advised in the description.

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive