Description
Original 8 May 2025, 2:38pm
A navigational closure is required for bottom gate refurbishment and various repair works.
The charity making life better by water
Making life better by water
Type: Navigation Closure
Waterway(s): Leeds & Liverpool Canal
From: 5 January 2026, 8am
To: 6 February 2026, 4pm inclusive
Region: North West
Reason: Repair
Programme: Winter works
| Closest waterway | Leeds & Liverpool Canal |
| Starts at | Lock 44, Top Lock |
| Ends at | Bridge 158, Changeline Bridge |
| Upstream winding hole | By bridge 153 - long ing bridge |
| Downstream winding hole | D/S Changeline Br (158) |
A navigational closure is required for bottom gate refurbishment and various repair works.
Sign up to our newsletter and discover how we protect canals and help nature thrive
