Skip to main content

The charity making life better by water

Accommodation bridge 10

Type: Navigation and Towpath Closure

Waterway(s): Hertford Union Canal

From: 28 May 2025, midnight

To: 30 May 2025, 7am inclusive

Region: London and South East

Reason: 3rd Party Works

Location

Closest waterwayHertford Union Canal
Starts atAccommodation Bridge 10
Ends atAccommodation Bridge 10
Upstream winding holeJunction of Hertford Union Canal and Regents Canal
Downstream winding holeJunction of Hertford Union Canal and River Lee

Description

Original 6 May 2025, 11:46am

To improve local pedestrian and cycle infrastructure over the canal in Hackney Wick. The existing footbridge at the junction of the Hertford Union Canal and the River Lea has been removed and is due to be replaced with a higher capacity structure. The works will involve closing the canal and the towpath overnight between the hours of 11pm - 6am over 3 nights on 27/05/2025, 28/05/2025 and 29/05/2025 so that the bridge span can be safely lifted back into place from the building site to the North of the canal. On the approach from the South the canal will be closed from the Top Lock 1 on Hertford Union canal to Bottom Lock 3, winding holes can be found at the Top Junction (Regents) and Bottom Junction (River Lea) Towpath moorings in the exclusion zone for lifting the bridge into position will be suspended but access can be maintained to areas either side with marshalling at the towpath diversion points.

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive