Skip to main content

We're the charity for your canals

Boaters' Update 20 Nov 2026

16 navigations reopened, winter works advance, facilities improve, licence fees announced and boaters help shape future licensing plans.

This week, we're highlighting some of the latest changes affecting boaters across the network. Since the last edition, 16 navigation closures have been lifted, winter maintenance work has continued to gather pace and further improvements to customer facilities are underway. We're also sharing details of the 2027/28 boat licence fee announcement and providing an update on work to shape the future of boat licensing. Elsewhere, we take a closer look at the vital role culverts play in keeping canals safe and navigable, and go behind the scenes as engineers carry out a detailed inspection of the historic Snarestone Tunnel on the Ashby Canal.

A man in a yellow jacket stands before railings. Canal works in progress behind the railings Winter works in action on the canals

What’s changed on the cut since the last edition?

Key themes at a glance

  • 16 navigations reopened across the network: Boating routes restored since the last edition include the River Soar, Upper Trent, Droitwich canals, Leeds & Liverpool Canal, Huddersfield Narrow Canal, Lancaster Canal and Peak Forest Canal, following work to address issues ranging from fallen trees and vegetation to bridge and lock repairs. Please note that restrictions in other locations on these waterways may affect cruising.
  • Winter works programme gathering pace: Planned maintenance activity continues across the network, with repairs, lock works, bridge maintenance and other infrastructure improvements accounting for the largest proportion of current stoppage notices as teams make the most of the winter stoppage season.
  • Vegetation remains a significant challenge: Recent storms and seasonal conditions continue to generate notices for fallen and overhanging trees, with several navigation closures and restrictions now resolved and others requiring ongoing monitoring and clearance work.
  • Customer facilities see mixed picture: A number of service issues have been resolved, including at Lapworth and Bosley, while some customer service facilities remain affected by faults, maintenance work or temporary outages.

What could affect your journey this weekend

Our roundup highlights some of the main changes across the network since the last edition. As always, before setting off, we recommend checking the latest stoppage notices for your route and surrounding waterways.

You can view all current notices for this weekend on our interactive map and you can sign up for personalised alerts. If you have a question about a particular stoppage or spot something that doesn't look quite right on the network, please get in touch. We're always happy to help.

Licence fee increase for 2027/28

From 1 April 2027, standard boat licence fees will increase by 3.95% for private boaters and boating businesses.

The increase has been set below the forecast rate of inflation, balancing the need to support boaters through ongoing cost-of-living pressures with the income needed to maintain the canal network.

As previously announced, the surcharges for boats without a home mooring and wide beam boats will continue to be phased in. The 2027-28 licence period will be the fourth year of the five-year introduction of these charges.

Matthew Symonds, head of boating and customer service, said: "We know many boaters continue to feel the effects of increased living costs, and we've taken this into account when setting licence fees for the year ahead.

"At the same time, licence income plays an important role in helping us care for an ageing network and keep waterways safe and navigable. We've sought to strike a balance between limiting increases for boaters while securing the income needed to invest in the canals."

Boaters will be able to use the Trust's online licence calculator from December to check the fee for their boat before renewing. The calculator is available at: licensing.canalrivertrust.org.uk/LicencePrices.

Gold Licence fees, which are agreed jointly with the Environment Agency, will be announced separately.

Shropshire Union, winter 2017, courtesy of Imogen Nailor Shropshire Union, winter 2017, courtesy of Imogen Nailor

Helping shape the future of boat licensing

Following extensive engagement with boaters, we've announced that the public consultation on the future of boat licensing will now take place in March 2027.

The additional time will allow us to fully consider the feedback gathered through a series of co-design workshops and ensure that boaters' experiences are reflected in the proposals that eventually go out for consultation.

The work follows the recommendations of the Independent Commission on Boat Licensing, which was established to review how the licensing framework could be made clearer, fairer and more effective for all boaters.

What we've heard so far

Over recent months, around 90 boating representatives have taken part in online and face-to-face workshops, including boating organisations, advisory groups and members of our Citizens' Boater Panel.

Several clear themes emerged during the discussions.

  • Boaters told us that it is more important to get the next stage right than to rush into consultation.

  • There was strong support for improving consistency across the network, making better use of existing powers, ensuring data is accurate and applying policies fairly.

  • Participants also highlighted the need for clear, plain-English communication, supported by evidence and recognising the different ways people use and enjoy the waterways.

  • Another recurring theme was the importance of taking a proportionate, case-by-case approach that considers individual circumstances and the diverse nature of the network.

What happens next?

The co-design process has also highlighted a distinction between improvements that can be implemented relatively quickly and more complex issues that will require wider consultation.

We're now reviewing the feedback in detail and will publish a comprehensive update at the end of January 2027.

This will include:

  • The full findings from the co-design programme
  • The issues that will be taken forward to public consultation
  • Improvements we can begin delivering immediately
  • Details of the next steps towards consultation in March 2027

Thank you for taking part

We're grateful to everyone who has contributed their time, expertise and experience so far. The range of perspectives shared through the workshops has helped shape the next phase of this work, and we'll continue to keep boaters updated as plans develop.

Walking in the winter

Improving pump-out, Elsan and water facilities

Reliable water points, Elsan disposal facilities and pump-outs are among the most important services on the network, so we're continuing work to make them easier to use, easier to maintain and less likely to be out of service.

Over recent months we've been working with manufacturers, regulators and boating representatives to develop new standard designs for water points and Elsan facilities, while also planning improvements to pump-out services across the network.

Designed with boaters in mind

To help shape the new designs, we've gathered feedback from boating organisations including the National Association of Boat Owners, the Accessible Waterways Association and members of our Navigation Advisory Group.

Their input is helping us improve accessibility, privacy and reliability, while creating facilities that are easier for our teams to maintain and repair.

Proposed improvements include:

  • Easier-to-use water taps and fittings
  • Improved accessibility and privacy
  • Better drainage arrangements
  • Designs that reduce blockages and downtime
  • Standardised components that make repairs quicker and more efficient

We've also listened to feedback about the appearance of newer water points and have updated the designs so they sit more naturally within the canal environment.

Importantly, there are no plans to replace heritage cast iron water points. Where these historic structures remain in service, we're standardising internal pipework to make repairs simpler and reduce the need for bespoke parts.

New pump-outs being installed

Work is already underway to install new pump-out equipment at ten locations across the network, with completion expected by March 2027. The first installation has already been completed at Wheaton Aston.

The new pump-outs will be installed at:

  • Kinver
  • Brentford Lock
  • Tyle Mill
  • Bradford on Avon
  • Dundas
  • Diglis
  • Mart Lane
  • Market Drayton
  • Saul Junction

New Elsan facilities and water points

The proposed Elsan design has now been reviewed by water industry regulators and approved, subject to some minor amendments. A prototype is expected to be ready in December.

Once tested, replacement units will initially be installed at locations currently relying on temporary facilities, beginning with Linslade and Hawkesbury. A wider rollout will follow.

Installation of the first 50 new water points is expected to begin between January and March, helping us test the design before a larger programme is introduced across the network.

What happens next?

We'll confirm installation dates as plans are finalised and continue to share updates as the programme progresses.

You can also find answers to frequently asked questions here: Water points and sewage disposal | Boating services | Canal & River Trust

Culverts: The hidden structures beneath our canal network

Recent incidents have highlighted one of the least visible but most important assets of the canal network: culverts.

When people think of engineering heritage on the cut, locks, aqueducts and bridges first spring to mind, but hidden beneath our canals, embankments and towpaths, are almost 2,000 culverts that quietly perform a vital role every day.

Many of the culverts still carrying water today date back to the original construction of the canals in the late 18th and early 19th centuries. The network includes a surprisingly wide variety of culvert types, including brick, stone and cast-iron structures, timber box culverts, vitrified clay pipes and even tunnels cut directly through rock.

Although some have been repaired, relined or rebuilt over the years, many continue to perform their function more than 200 years after they were first constructed. Modern engineering standards typically design new culverts for a service life of around 120 years (although not guaranteed, in practice they will probably last a lot longer). The canal network's historic culverts have proved remarkably durable by comparison, with the majority remaining in good condition despite requiring relatively limited intervention during their lifetime.

Why culverts are so important

Without culverts, water flowing across the landscape would be blocked by the canal, increasing the risk of flooding and damage. While most culverts carry water, some are also used to accommodate services such as communications, power or water supplies.

As recent events have shown, if a culvert becomes blocked, damaged or starts to deteriorate, it can undermine embankments, contribute to flooding and, in some cases, affect navigation.

How we keep an eye on them

The Trust uses a three-tier inspection regime to monitor culverts and to identify problems before they become failures.

Routine Safety & Service Inspections take place every one or two months, whilst General Inspections are carried out at least every four years. More detailed Principal Inspections are undertaken every eight to 24 years, depending on risk, and can involve specialist confined-space inspections or CCTV surveys. Between 120 and 140 culverts receive detailed CCTV inspections each year.

Engineers look for signs of cracking, movement, voids, water ingress and structural deformation, as well as changes in the surrounding embankments, towpaths and canal banks that could indicate developing problems.

Why do failures happen?

Failures are often caused by a combination of age, water pressure, ground movement, structural deterioration and increasingly extreme weather.

Interestingly, many reported culvert failures are not caused by the culvert itself. Instead, water escaping from the canal bed or surrounding structures can find its way along the culvert alignment, causing damage to embankments and surrounding ground while leaving much of the culvert intact.

Why repairs can take time

When a potential failure is identified, the first priority is always public safety and controlling any loss of water. Depending on the circumstances, teams may install sealing sheets, stop planks or temporary dams while investigations take place – for example all of these have been used in the recent culvert failure on the Llangollen.

Repairing a culvert can be complex. As they are underground, engineers often need to understand exactly what has happened before a repair solution can be designed. Access for heavy plant, water management, environmental and heritage consents, and modern health and safety requirements can all influence timescales.

A prime example of this could be found at a remote site on the Macclesfield Canal between Bridge 51, Cowley Bridge and Bosley Lock 12 last year. The £350k, 12 week project included a 400m-long metal track and ramps to allow vehicles and machinery to safely gain access, repairing the damaged culvert headwall, relining the excavated canal bed with around 150 tonnes of clay, installing new metal sheeting and around 40m of new fencing and hedging.

Investing in resilience

The Trust continues to invest in inspections, monitoring and targeted maintenance across the network.

Specialist teams use a range of technologies including crack monitors, tilt monitors, water-level monitoring systems and point-cloud surveys to track the condition of culverts. Trials of AI-supported camera technology are also helping provide earlier warning of potential issues.

While they may be hidden from view, culverts play a vital role in keeping canals safe, navigable and resilient for the future.

Leicestershire's oldest canal tunnel gets a crucial check-up

Most boaters pass through tunnels without giving much thought to what goes on behind the scenes to keep them safe and navigable. But earlier this month, one of the oldest tunnels on our network underwent a detailed health check as part of our ongoing programme of inspections.

Built around 1795, Snarestone Tunnel on the Ashby Canal is 229 metres long and remains an important part of the waterway more than 230 years after it was constructed. The tunnel and its Grade II listed portals continue to carry boats today, despite having been built entirely by hand using little more than pickaxes, shovels and determination.

As part of a ten-yearly Principal Inspection, our specialist engineers travelled through the tunnel by boat to carry out a detailed assessment of its condition. The inspection involved close examination of the brick lining, checking for any signs of movement, cracking or deterioration, and a hands-on survey using specialist tools to identify any areas that may require further investigation.

Considering its age, the engineers were pleased with their initial assessments but the findings will now be reviewed in-depth and used to help plan any future maintenance needed to protect the structure.

Preserving 230 years of canal history

With more than 2,000 miles of canals and rivers in our care, inspections like these play an important role in helping us understand the condition of the network's historic infrastructure and prioritise investment where it is most needed.

Peter Simpson, Principal Engineer, said: "Snarestone Tunnel was built by hand with basic tools like pickaxes and shovels over 230 years ago, so it's fantastic to see it still in use by boats and a real privilege to follow in the footsteps of those that built it.

It's our job to keep these wonderful working monuments alive so that they can be used and enjoyed today and for many years to come. This inspection is a good example of the constant effort that's needed to protect, maintain and repair the nation's historic waterways."

Watch our engineers in action below as they inspect one of the canal network's oldest tunnels.

Did you know?

We have over 600 water points across our network that provide essential potable water for boaters. To maintain high standards of hygiene and protect water quality, please use these facilities only for collecting potable water. They should not be used for activities such as rinsing toilet cassettes, cleaning equipment, or washing other items. By using each facility as intended, you can help reduce contamination risks and ensure a better experience for everyone.

Last Edited: 20 November 2026

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive