Description
Original 17 October 2025, 3:24pm
Overnight (22:00pm to 06:00am) Steel work repairs to Bridge 200B, via floating modular pontoon and scaffold tower within the canal waters.
Safety boat also to be present.
Towpath will always remain unrestricted. a pontoon will be present within the canal, however this will be moved aside to allow the safe passage of passing boats.