Description
Original 19 September 2025, 8:33am
Sheet piling works being undertaken on behalf of a resident whose garden forms the offside edge of the canal. The works are to stabilise the bank by preventing erosion and undercutting of the bank.
For advice only. All works will be carried out from the off side bank, with no impact on the width of the waterway. Caution signs will be in place either side of the work site.