Description
Original 10 September 2025, 1:01pm
Contractor Lankelma will be carrying out ground investigations works to the existing river walls adjacent the Bromley-By-Bow Gasworks site.
To facilitate the works a cantilever frame will extend approximately 1.5 metres out into the navigation.
Advanced warning signage will be positioned 100m and 200m both upstream and downstream to warn boaters navigating the Creek at High tides.