Description
Original 8 September 2025, 11:54am
Third party contractors are to be carrying out inspection works to Stone Street Bridge on the Old Main Line Canal using a floating pontoon.
The pontoon is to be positioned to allow waterway traffic to pass during the works. Signage is to be placed both upstream and downstream of the works and pontoon access locations to notify boaters and tow-path users.