Updates
09/04/2025 09:24
Eastwood Lock is still only running on one sluice on the upstream.
Divers have been to site today (08/04/2025) to investigate the issue. The defective sluice has been closed, but the lock will require dewatering to fully repair.
Navigation is still possible but please beware that it will take longer for the lock to fill.
We will update this notice when engineers can advise when a stoppage will take place.
08/04/2025 16:15
Eastwood Lock is still only running on one sluice on the upstream.
Divers have been to site today to investigate the issue. The defective sluice has been closed, but the lock will require dewatering to fully repair.
Navigation restrictions will be ongoing until engineers can advise when a stoppage will take place.