Description
XIAED will be undertaking monthly inspections of Bridge 200B, Gwr Bridge on the Grand Union Canal via a modular pontoon.
The pontoon will be moved to allow the safe passage of passing boats, the towpath will always remain unrestricted.
2025 – 2026 Inspection Dates:
22.04.25
20.05.25
17.06.25
15.07.25
12.08.25
09.09.25
07.10.25
04.11.25
02.12.25
06.01.26
03.02.26
03.03.26