Skip to main content

The charity making life better by water

Restriction and Mooring Suspension for offside scaffold and pontoon fender at 525 Harrow Road. Navigation width and sightlines to be restricted so towpath side moorings suspended.

Starts: 16 December 2024 08:00 am

Ends: 29 December 2025 06:00 pm inclusive

Type: Advice

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterwayPaddington Arm (Grand Union Canal)
Starts atBridge 4Ab (Footbridge)
Ends atAccess Point

Updates

10/12/2024 12:31

End date amended to 29/12/2025

Description

Contractor installing Scaffold on the offside of the Paddington Arm at 525 Harrow Road. The Trust has mandated a fender be positioned within the waterway to protect boats and the scaffold. This will restrict the width of the canal so a limited stretch of visitor moorings on the towpath side will be suspended for navigational safety.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our newsletter and discover how we protect canals and help nature thrive