Updates
23/01/2024 11:29
The large low level tree stump overhanging the towpath between bridge 15 and 15A, on the Ashby Canal has now been cleared. Towpath users can proceed as normal.
The charity making life better by water
Making life better by water
Starts: 15 January 2024 12:00 am
Ends: 23 January 2024 12:00 am inclusive
Type: Advice
Reason: Vegetation
Is the towpath closed? No
Closest waterway | Ashby Canal |
Starts at | Bridge 15A |
Ends at | Bridge 15, Lime Kilns Bridge |
The large low level tree stump overhanging the towpath between bridge 15 and 15A, on the Ashby Canal has now been cleared. Towpath users can proceed as normal.
There is a large low level tree stump overhanging the towpath between bridge 15 and 15A, near the pipe bridge on the Ashby canal.
Towpath users are advised to take extra care when walking this section of the towpath.
Contractors are being arranged to cut back the tree stump and we will update the website with more information by Monday 22nd January.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration