Description
The Customer Operations team will be conducting routine maintenance to the North and South Portals of Wast Hill Tunnel, to include the Off-Side which needs to be accessed at the Tunnel Portals. This will mean that the Tunnel for the Duration of the Works will be Non-Navigable, we aim to complete the works as soon as possible on the day to minimise any disruption.