Skip to main content

The charity making life better by water

Locks 30 and 31, Brickyard Double Lock, near Shireoaks, Chesterfield Canal

Starts: 15 October 2018 08:00 am

Ends: 5 November 2018 04:00 pm inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? Yes

Location

Closest waterwayChesterfield Canal
Starts atLock 31, Brickyard Double Lock (Bottom)
Ends atLock 30, Brickyard Double Lock (Top)
Upstream winding holeThorpe Windinghole
Downstream winding holeTurnerwood Bridge

Updates

03/09/2018 15:24

Locks 30 and 31, Brickyard Double Lock.

A navigation closure is required to carry out the replacement of the bottom gates.

It may be necessary to close the towpath for short periods during these works to ensure the public's safety. Signage on site will provide further information.

Please be aware the start date of this closure is outside our published Winter Stoppage period.

Description

Locks 30 and 31, Brickyard Double Lock, near Shireoaks, Chesterfield Canal.

Replacement of Bottom Gates.

Please be aware the start date of this closure is outside our published Winter Stoppage period

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration