Our maintenance staff have braved daily downpours, storms and mud to work on the Tyrley, Adderley and Audlem lock flights on the Shropshire/Staffordshire border - a total of 25 locks.
They are battling through horrendous weather and ground conditions to refurbish or replace eight sets of lock gates, replace and re-work 14 lock ladders and carry out vital masonry repairs and ground stabilisation work.
The canal has had to be drained in certain sections to allow scaffolding and lifting equipment to be installed and lock gates, weighing several tonnes, to be craned in and out. Other existing gates have been strengthened and repaired to create a water tight seal – essential for the smooth operation of the navigation.