Description
Lock 1: Brickwork repairs to the lock chamber.
Lock 2: repairs to the bottom end gates.
Lock 3:Repair to the lock gates, damaged through boat impact.
The charity making life better by water
Making life better by water
Starts: 2 November 2016 12:00 am
Ends: 15 December 2016 11:59 pm inclusive
Type: Navigation Closure
Reason: (Re)Construction
Is the towpath closed? No
Closest waterway | Llangollen Canal |
Starts at | Lock 1, Grindley Brook Locks Staircase |
Ends at | Lock 3, Grindley Brook Locks Staircase |
Upstream winding hole | Whitchurch winding hole, between Bridges 30A and 31 |
Downstream winding hole | Thomasons winding hole, between Bridges 22 and 23 |
Lock 1: Brickwork repairs to the lock chamber.
Lock 2: repairs to the bottom end gates.
Lock 3:Repair to the lock gates, damaged through boat impact.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration