Skip to main content

The charity making life better by water

Bank Dole Cut

Starts: 27 April 2024 02:45 pm

Ends: On-going

Type: Advice

Reason: Information

Is the towpath closed? No

Location

Closest waterwayBank Dole Cut
Starts atBank Dole Lock (Lock 5)
Ends atBank Dole Lock (Lock 5)

Description

The sluice water deflector on the upstream gate sluice (none-house/river side) is missing. When travelling upstream from the River Aire, please open the opposite side sluice first. Only operate the none-house/river side sluice once the water in the lock is half way up.

Thank you.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration